佳工机电网 在线工博会 我的佳工网 手机版 English
关键字  
  选择展区 >>
您的位置: 首页 > 模具设计与制造展区 > 塑料模具展厅 > 产品库 > 热流道 > 技术论文 > 正文 产品库 会展 人才 帮助 | 注册 登录  
塑料模具
 按行业筛选
 按产品筛选
查看本类全部文章
e展厅 产品库 最新动态 技术文章 企业目录 资料下载 视频/样本 反馈/论坛
  技术应用 | 基础知识 | 外刊文摘 | 业内专家 | 文章点评 投稿 发表科技文章 
Give your tooling an checkup with these 8 tips
作者:Craig Kovacic
欢迎访问e展厅
展厅
1
塑料模具展厅
注塑模具, 吹塑模具, 挤出模具, 吸塑模具, 瓶胚模具, ...
Yearly maintenance procedures will be different for every injection molding location depending on mold cycle volume. Here are some general guidelines that any molder can use for your hot runners, heaters, leader and ejector pins and more to keep your tooling running efficiently and to prevent unwanted surprises.

1. Check vents for telltale rust or moisture – If you see rust or moisture around a hot runner vent hole, it indicates internal condensation or the possibility that a water line popped off. This moisture causes a short and can be fatal to heaters. When machines are not running 24/7 and are turned off overnight or on weekends, the chances of such condensation increases.

2. Take the time to remind operators not to ‘clear’ nozzle tips from gates – If an operator happens to notice a tiny piece of steel flush with the gate of the mold, it may turn out to be a point-gate needle assembly. ‘Clearing’ this perceived obstruction usually destroys the nozzle tip. To prevent nozzle destruction, verify the tip style of the hot runner system before taking action and assure all operators are well trained to identify the different tip styles they will come in contact with.

3. Lubricate the slide retainers – This is an activity that really should be done once a week if running a 24/7 operation. Year-end is a great opportunity to create a routine maintenance program for lubricating these parts.

4. Cross-check your heater ohm readings – Assuming you checked the ohm readings when your heater was new, this is the time to take a new reading and compare. If the readings are up or down by 10 percent, it is time to start thinking about replacing the heater to ensure it does not fail at a critical time during your production process. If the initial ohm reading was never taken, get a reading now and use that as a baseline for future checks on that heater.

5. Look for signs of wear between leader pins and bushings – Look for scores or scrapes. This damage is due to a lack of grease. If marks are just beginning, you can extend the life of the leader pins and bushings by keeping them well greased. If you find significant wear, it is time to install new parts. Otherwise, cavities and cores may not line-up properly, resulting in unequal wall thickness on your part.

6. Check for water flow – Hookup a hose to the out port and run water through the water line into a bucket. Unclear or colored water may be a sign of rust and poor water flow signifies blockage. Drill out the water lines if these problems are found (or clean with whatever method you typically use). Future problems due to rust and blockage can be prevented by improvements in the plant’s water treatment system.

7. Clean the ejector pins – Over the course of one year, ejector pins will become dirty with gas buildup and film. A good cleaning with mold cleaner every six to12 months is recommended. Once clean, put a light coating of grease on the pins to prevent galling or breakage.

8. Look for nicks in the radius area of your sprue bushings – Nicks are caused by leftover loose, hardened pieces of plastic left in the machine nozzle that cause damage due to clamping force from the injection carriage unit during injection forward. Problems may also occur from a misalignment issue. Look for both possibilities when nicks are found. Replace sprue bushings if damage is bad to prevent a flower pot leak (an old molders term: leakage of plastic between the bushing and the machine nozzle tip).

Following these tips will help you to recognize and prevent potential problems, keeping your molds running at optimal levels. (end)
文章内容仅供参考 (投稿) (2/15/2009)
查看更多热流道相关文章: more
·Hot Runner Selection D-M-E North America, Trevor Pruden (2/15/2009)
·Hot runner systems for bio-resins D-M-E North America, Trevor Pruden (2/15/2009)
·热流道的选择 迪恩易上海办事处 顾明 (1/21/2009)
·可加工生物树脂的热流道技术 newmaker (11/6/2008)
·热、冷流道的选择 北美迪恩易公司(DME) Trevor Pruden (10/28/2008)
·Moldflow在利用针阀式热流道消除熔接痕中的应用 (9/23/2008)
·不断改进的热流道系统 ASSOCOMAPLAST总经理 Claudio Celata (8/17/2008)
·热流道相关技术 (8/11/2008)
·如何选择最好的热流道? 卡尔•科克兰德 (4/6/2008)
·热流道模具 newmaker (3/2/2008)
查看更多塑料模具相关文章: more
·金属3D打印随形冷却注塑模具生产率提高30% 3D Systems (7/13/2019)
·Hot Runner Selection D-M-E North America, Trevor Pruden (2/15/2009)
·Hot runner systems for bio-resins D-M-E North America, Trevor Pruden (2/15/2009)
·变形预补偿在风扇注射模具设计中的应用 张家界航空工业职业技术学院 卢端敏 (2/4/2009)
·硬铣注塑模 newmaker (1/21/2009)
·热流道的选择 迪恩易上海办事处 顾明 (1/21/2009)
·模流分析趋势报告-真实三维分析技术,竞争力的保障 Moldex3D (1/16/2009)
·Moldflow精确分析的材料技术解决方案 Moldflow中国区技术经理 姜勇道 (1/13/2009)
·注塑模具年底检修的八条建议 D-M-E (1/6/2009)
·应用于模具制造的一种铜-镍-硅-铬合金 newmaker (1/6/2009)
查看相关文章目录:
·模具设计与制造展区 > 塑料模具展厅 > 热流道 > 塑料模具文章
文章点评 查看全部点评 投稿 进入贴吧


对 塑料模具 有何见解?请到 塑料模具论坛 畅所欲言吧!


网站简介 | 企业会员服务 | 广告服务 | 服务条款 | English | Showsbee | 会员登录  
© 1999-2024 newmaker.com. 佳工机电网·嘉工科技